New structured cabling system for AllianceBernstein

Systems
Tyco AMP Cat6

Project Description
AllianceBerstein is on of the largest publicly traded global asset
management firms in the world.

When AllianceBernstein were refurbishing their offices in Berkeley Street, Able Data were contracted to build a new structured cabling system. Spread over four floors, Able Data installed 5,000 new outlets and over 4,000 computer room links. A tight programme required
completion in less than size weeks, achieved by using pre-termination to pre-build cable assemblies off site and night working on site.

Each floor was flood wired back to two patch rooms per floor. All of the patch rooms were connected to the main and backup computer rooms through diversely routed Cat6 copper and OM3 fibre.

Able Data were subsequently awarded the contract to review the cabling at Devonshire House, another AllianceBernstein site in London.

Download DateNotes
Alliance Bernstein2006319 KB
Dedicated software is required to view PDF files. Your computer may already have PDF viewing software installed; it may have been included with your Web browser or operating system. If you do not have it already, you will need to download and install the PDF viewing software of your choice in order to view the PDF files on this site.