Ashburton Court

Summary
Hampshire County Council Office HQ & Data Centre

Location
Winchester City Centre

Systems Installed
Nexans Lanmark-6 10G F/UTP, Nexans LANsense System, Excel Cat6

Start & Finish
Sep 2007 – May 2009

Project Description
In 2009 Hamshire County Council (HCC) completed a major office refurbishment of its HQ building at Ashburton Court. The conversion of this 1960’s council office building to a naturally ventilated, low energy facility included a heat recovery from the internal Data Centre as a source of heat to service the office areas.

Able Data were contracted by BAM to install a data cabling system providing 4,000 Cat6 outlets to the new offices and meeting rooms. Able Data also won the contract to build the new Data Centre facility, completed over eight weeks in Spring 2009. With 70 Prism server cabinets, 5,000 copper links and 2,000 fibre links, this new data centre has become HCC’s primary Data Centre. The facility incorporates leading edge Data Centre technologies to maximise space and power usage and to enable remote operation. Functionality installed by Able Data included a Nexans 10G Ca6a copper cabling system, a Nexans Intelligent Infrastructure Management (IIM) system, Nexans remotely control Intelligent PDU’s and a Data Centre wide Austin Hughes KVM system.

Download DateNotes
Ashburton Court2007/2009254 KB
Dedicated software is required to view PDF files. Your computer may already have PDF viewing software installed; it may have been included with your Web browser or operating system. If you do not have it already, you will need to download and install the PDF viewing software of your choice in order to view the PDF files on this site.
Able Data Installations on LinkedIn