Bank of China

Summary
Multi-floor Cat6 Tyco Amp Installation

Location
19 Old Jewry, City of London, London, EC2

Systems
Tyco AMP, OM3 Fibre backbone, Cannon Cabinets

Start & Finish
May 2010 – October 2010

Project Description
The Bank of China, the world’s fourth largest bank, moved into its new flagship City office at One Lothbury, premises which are opposite to the Bank of England and occupy one of the City’s most iconic buildings.

Before The Bank of China could move in, Able Data were contracted to install a new structured cabling system. The project involved the installation of 5,000 outlets over 12 floors, including the cabling of a dealing area on the sixth floor. Each floor has its own patch room, all connected to the main computer room through a diversely routed copper and OM3 fibre backbone. A feature of the project was the building of a Cannon cold aisle solution within the computer room, significantly reducing the costs of cooling the data centre.

Image Gallery

Gallery Bank of China (1)Gallery Bank of China (2)Gallery Bank of China (3)Gallery Bank of China (4)Gallery Bank of China (5)Gallery Bank of China (6)

Download DateNotes
Bank of China2010109 KB
Dedicated software is required to view PDF files. Your computer may already have PDF viewing software installed; it may have been included with your Web browser or operating system. If you do not have it already, you will need to download and install the PDF viewing software of your choice in order to view the PDF files on this site.
Able Data Installations on LinkedIn