Project Description
Fidelity International is a world-wide leading investment provider. As part of their UK data centre consolidation strategy, Fidelity required a new Data Centre facility at its HQ facility at Tonbridge.
Spread over two underground data halls and two office floors, the project required the installation of 30,000 Cat6 copper links and 11,000 OM3 duplex fibre links to 300 Rittal cabinets and used more than 700km of cable. All links connect to a patch field of 80 x CPI patch frames, each monitored with the iPatch Intelligent patch system.
The Data Centre was cabled overhead on three levels of CPI ladder racking. One of the biggest challenges faced by Able Data was to deliver the required high quality of cabling. To work out the optimum cable routing schemes, Able Data built an offsite mock up of a row of patch frames and the associated cables. To speed up installation whilst minimising unsightly cable slack, Able Data single end pre-terminated all copper and fibre links. The entire installation was completed over a 14 week period.
As well as building and configuring a 40,000 port iPatch system to manage patching and monitor network devices, Able Data implemented additional bespoke functionality tailored to Fidelity’s requirements, including auto server provisioning.
Image Gallery
Previous Fidelity Investments Projects
Download ![]() | Date | Notes |
|---|---|---|
| Fidelity Oakhill Data Centre | 2009 | 257 KB |
Dedicated software is required to view PDF files. Your computer may already have PDF viewing software installed; it may have been included with your Web browser or operating system. If you do not have it already, you will need to download and install the PDF viewing software of your choice in order to view the PDF files on this site. | ||