Reynolds Porter Chamberlain
Summary
A new structured cabling system as part of a new office fit out of Tower Bridge House
Systems Installed
6,000 Cat6 outlet installation, Beldon CDT bonded cable system
Project Description
Leading law firm, Reynolds Porter Chamberlain, have consolidated their London offices into the prestigious new Tower Bridge House building, adjacent to Tower Bridge.
Overbuy contracted Able Data to install a new structured cabling system. This is a 6,000 Cat6 outlet installation, providing a flood wired facility over four floors of the building. In order to fit into the fast track program, Able Data had to pre-fabricate the cable looms off site. This system is based on the Belden CDT bonded cable system. Able Data have also designed and installed an iTRACS cable management system, allowing RPC to monitor and manage their new infrastructure.
Christine Hatton, Business Development Manager at Able Data commented "We are delighted that Reynold Porter Chamberlain selected Able Data to have assisted them with this innovative project. This further enhances Able Data's reputation working with high profile city organizations".
The Project was won following a formal tender process managed by Coleman Bennett international (CBI). David Boyce, Technical Director at CBI Stated that Able Data had been successful, due to their commitment to deliver the project and competitive pricing.
