Scotia Bank
Cabling out of a new dealing floor and Data Centre
Location
Scotiabank Europe, 201 Bishopsgate, London, EC2M 3AB
Systems
Commscope Systimax Cat6, VisiPatch & LazrSPEED InstaPatch
Start & Finish
November 2010 – February 2011
Project Description
The project included the cabling of a large dealing floor plus a new Data Centre.
The dealing floor required 2,000 Cat6 links presented in 2-way and 6-way GOP’s. All outlets were cabled back to the patch frame in the Data Centre, which consisted of 18 of the elegant VisiPatch 360 patch frames.
The Data Centre required 50x Panduit server cabinets, all connected back to the patch frame via Cat6 links and to SAN cabinets via InstaPatch fibre links.
Image Gallery
Download ![]() | Date | Notes |
|---|---|---|
| ScotiaBank | Aug 11 | 162 KB |
Dedicated software is required to view PDF files. Your computer may already have PDF viewing software installed; it may have been included with your Web browser or operating system. If you do not have it already, you will need to download and install the PDF viewing software of your choice in order to view the PDF files on this site. | ||